RMC Roar!

RMC Steel-Topper Retrack

Although never “officially” completed, RMC Roar! is my take on a Rocky Mountain Construction redesign of Roar! at Six Flags Discovery Kingdom. I designed the layout prior to the 2015 announcement of The Joker, the actual RMC redesign of the ride. A large amount of consideration went into designing the layout within the constraints of the original wood structure of Roar!, in the same manner that RMC reuses support structures.

July 2015 - January 2016 (6 Months of Construction)